Journal Search Engine
Download PDF Export Citation Korean Bibliography PMC Previewer
ISSN : 1229-6783(Print)
ISSN : 2288-1484(Online)
Journal of the Korea Safety Management & Science Vol.14 No.3 pp.127-134
DOI :

안전관리를 위한 AHP 설비 평가시스템 개발에 관한 연구

윤 여 권*, 조 용 욱**, 양 광 모***
*유한대학교 기계설계과, **인덕대학 테크노경영과, ***유한대학교 산업경영과

A Study on the Development of Analytic Hierarchy Process Plant Evaluation System for Safety Management

Yeo-Kwon Yun*, Young-Wook Cho**, Kwang-Mo Yang***
*Department of Mechanical Design, Yuhan College
**Department of Technology and Systems Management, Induk Institute of Technology
***Department of Industrial Engineering, Yuhan College

Abstract

Plant safety management that is enforcing introducing more than 95% in domestic manufacturing industry isusing total plant efficiency by the evaluation index, and as a result, can see a lot of examples that plantproductivity, economy and safety is increased. The efficient safety estimation for a business should analyze anaccident data by considering every possible and potential factor. This study's purpose centers plant safetymanagement activities that is management system for plant production and safety efficiency's maximization,plant evaluation system that plant safety management activities factor(reliability, maitainability, safety, servicequality) that is enforcing in manufacturing industry can develop evaluation model that can evaluate qualitativeactivities by quantitative activities in process that maximize plant safety management wishes to do design.

Reference

1. Paick, Jong-Yob(2010), "A Study on the Effects by the Overall Equipment Effectiveness on the Organizational Effectiveness in Korean Small and Medium Manufacturing Industries", Myongji university Ph.D.
2. Lee Min-Ho(2010), "A Study on an Equipment Performance Measurement System for Effective Bottleneck Management", Kores university master
3. Jun, Hyun-Jung(2005), "A Study on Selection of Optimal Fool Proof Factor by Function Deployment in the Enterprise`s Characteristics", Myongji university Ph.D.
4. Han In-Soo(1990), "Influence of managerial choice on machine operator's behaviors and attitudes in implementing advanced manufacturing technology", Seoul university Ph.D.
5. Neely, A., Gregory, M. and Platts, K.(1995), "Performance measurement System Design: A literature review and research agenda, International Journal of Operations & Production Management", Vol. 15, No. 4, pp.80~116.
6. M. S. Jones, C. J. Malmborg and M.H. Agee(1985), " Robotics: decision support systems used for robot selection" Ind. Engng 20, pp66-73.
7. P. Y. Huang and P. Ghandforoush(1984), "Robotics: procedures given for evaluating selecting robots," Ind. Engng Apr, pp44-48.
8. Saaty Thomas L.(1994), "Highlight and Critical Points in the Theory and Application of the Analytic Hierarchy process, Eur. J. Operational Research (74)3, pp.426-447
9. Saaty T.L.(1980), "The Analytic Hierarchy Process", Mcgraw-Hill
10. Cho, Yong Wook(2002) "Selecting the Optimal Preferred Facilities with Multiple charateristics using Loss Function, pp.127~135.
  1. SEARCH
  2. Online Submission

    http://submission.koreasafety.or.kr

  3. KSSM

    The Korean Society of Safety ManagementWaste Society

  4. Editorial Office
    Contact Information

    - Tel: +82.31.336.2844
    - Fax: +82.31.336.2845
    - E-mail: safety@mju.ac.kr