ISSN : 2288-1484(Online)
DOI : https://doi.org/10.12812/ksms.2013.15.4.279
냉각팬 모터 제조공정의 품질개선에 관한 사례연구
A Case Study of Quality Improvement practice in Cooling Fan Motor Manufacturing
Abstract
- 0060-01-0015-0004-33.pdf738.5KB
Reference
2.Hyuck-Moo Kwon, Jung-Taek Kim and Joon-Ho Choi(2000), " a Six Sigma project for Decreasing Waste Concrete in a Housing Construction Site", Journal of Quality Innovation Vol.1No.1 : 4-9
3.Sung-Hoon Hong, Sang-Boo Kim and Min-Koo Lee(1999), "Successes in Six Sigma", Journal of the Korean Society for Quality Management Vol 27 No.3 : 202-208
4.Sung-Uk Lim, Seong-Pil Yoon and Chang-Soo Kim(2006), " A Study on how to find new Project of Six Sigma", Journal of the Korea Safety Management & Science Vol. No.5 : 27-56
5.Fontenot, G., Banara, R., and Gresham, A.(1994) "Six Sigma in Customer Satisfaction", Quality Progress December : 73-76
6.Harry, M,J(1998), " Six Sigma : A Breakthough Strategy for rofitability", Quality Progress May : 60-64
7.Hoerl, R.W(1998), " Six Sigma and the Fu ture of the Quality Profession", Quality Prog ress July : 35-42
-
-
Online Submission
http://submission.koreasafety.or.kr
-
KSSM
The Korean Society of Safety ManagementWaste Society
-
Editorial Office
Contact Information- Tel: +82.31.336.2844
- Fax: +82.31.336.2845
- E-mail: safety@mju.ac.kr