ISSN : 2288-1484(Online)
DOI : https://doi.org/10.12812/ksms.2013.15.4.185
안전관리 및 생산 공정 개선을 통한 생산성 향상에 관한 연구 : 폴리우레탄 제조업체 사례
A Study on Productivity Improvement through Safety Management and Manufacturing Process Reengineering : Case Study in Polyurethane Manufacturer
Abstract
- 0060-01-0015-0004-23.pdf982.5KB
Reference
2.Jeong, J.Y., Park, S.W., Lee, J.E. and Lee, G.Y., "Diisocyanate Exposure Assessment for Polyure thane Foam Manufacturing Workers", Journal of Korean Society of Occupational and Environmen tal Hygiene, Vol.22, No.3, (2012) : pp. 209-216.
3.Kim, D.H., Park, D.B. and Kwon, I.H., "Product ivity Improvement Plan Using Motion Analysis and Facility Relocation : Case Study", Journal of the Korea Safety Management and Science, Vol.12, No.1 (2010) : pp. 71-81.
4.Korea Industrial Safety Association, Check List for Hoist Work (2013).
5.Niebel, B. and Freivalds, A., Methods, Standards, and Work Design, McGraw-Hill (2002).
6.Oretel, G., Polyurethane Handbook, Hanser Publ isher (1993)
7.Piralishvili, S.A. and Ivanov, R.I., "Calculation and Experimental Investigation of Mixture Formation in a Vortex Mixer", Russian Aeronau tics, Vol.55, No.2, (2012) : pp. 179-183.
8.Szycher, M., Szycher's Handbook of Polyuretha nes, CRC Press (2012).
9.Vollmann, T.E., Berry, W.L., Whybark, D.C. and Jacobs, F.R., Manufacturing Planning and Control Systems for Supply Chain Management, McGraw -Hill (2004).
10.Walpole, R.E., Myers, R.H., Myers, S.L. and Ye, K.E., Probability and Statistics for Engineers and Scientists, Pearson (2011).
-
-
Online Submission
http://submission.koreasafety.or.kr
-
KSSM
The Korean Society of Safety ManagementWaste Society
-
Editorial Office
Contact Information- Tel: +82.31.336.2844
- Fax: +82.31.336.2845
- E-mail: safety@mju.ac.kr