Journal Search Engine
Download PDF Export Citation Korean Bibliography PMC Previewer
ISSN : 1229-6783(Print)
ISSN : 2288-1484(Online)
Journal of the Korea Safety Management & Science Vol.19 No.1 pp.203-210
DOI : http://dx.doi.org/10.12812/ksms.2017.19.1.203

A Study on the Heuristic Algorithm Development for Load Balance Ratio Increase of Workers in Warehouse

인하대학교 산업경영공학과|인하대학교 산업경영공학과|인하대학교 산업경영공학과|한국항만연수원 인천연수원|인하대학교 산업경영공학과

Abstract

Companies are pursuing the management of small quantity batch production or JIT(Just-in-time) system for improving the delivery response and LOB(Line Balancing) in order to satisfy consumers’ increasing demands in the current global economic recession. And in order to improve the growth of production for reducing manufacturing cost, improvements of the Load Balancing have become an important reformation factor. Thus this paper is aimed at warehouse which procures materials on the assembly line in procurement logistics of automotive logistics and proceed with research on heuristic algorithm development which can increase the Load Balancing of workers. As a result of this study, when applied the primary target value, it was verified that the whole workers decreased from 28 to 24. Furthermore, when specified the secondary target value and applied algorithm once more, it was verified that the Load Balance Ratio was improved from 44.96% to 91.7%.

물류창고 불출자 로드밸런스율 증대 휴리스틱 알고리즘 개발

초록

Figure

Table

  1. SEARCH
  2. Online Submission

    http://submission.koreasafety.or.kr

  3. KSSM

    The Korean Society of Safety ManagementWaste Society

  4. Editorial Office
    Contact Information

    - Tel: +82.31.336.2844
    - Fax: +82.31.336.2845
    - E-mail: safety@mju.ac.kr